After a weekend of much progress the kitchen is almost ready to be spackled. Saturday and a small part of Sunday was spent running wire, installing all of the lighting, and wiring the necessary boxes so when power is provided to everything it will all work. Sunday I also insulated about half of the kitchen and then on Monday I insulated the rest of the kitchen, installed plywood in the attic so Kate would have her precious storage space, and then Eric and I installed drywall on almost he entire ceiling. Also on Monday the cabinets arrived. Unfortunately I’m not ready to install them. Hopefully in a week or two I will be. Pictures of the above progress will be provided in a day or two. Stay tuned